Liner selection, slope calculator, ANSI 118.10 compliance & HVHZ requirements
FL BUILDING CODE COMPLIANTDry-Pack Mix Ratio (FL Standard):
5 parts clean sand : 1 part Portland cement (Type I or II)
Water: just enough to hold shape when squeezed โ "sandcastle consistency"
Do NOT use pre-mixed mortar or thin-set for mortar bed
Min Mortar Bed Thickness (ANSI A108.01):
โข At drain: 3/4" minimum over liner
โข At curb / walls: 1-1/4" minimum
โข Reinforcement: 15 lb. felt or metal lath when bed exceeds 1-1/4" in residential FL
Cure Time Before Tile (FL Heat & Humidity):
โข Dry-pack bed: 24โ72 hours (minimum 24 hrs before walking on)
โข Tile installation: minimum 24 hrs after bed achieves 75% strength
โข Do NOT let mortar bed dry too fast โ cover with plastic in direct FL sun
Curb Height Requirements (FL):
โข Standard shower curb: 2" minimum above finished shower floor (FBC R307.2)
โข ADA / barrier-free: max 1/2" curb height for roll-in compliance (ADA 2010 ยง608.7)
โข Steam shower curb: 9" minimum above shower floor (to retain steam)
โข HVHZ (Miami-Dade / Broward): verify curb height with local AHJ โ some coastal areas require 3" min for water intrusion protection
ANSI A118.10 is the gold standard for bonded waterproofing membranes in FL.
โข Membrane must achieve 7-day water absorption โค 0.2%
โข Elongation โฅ 50% at break (critical for FL thermal expansion cycles)
โข Adhesive shear strength โฅ 50 psi after water immersion
โข Products meeting ANSI A118.10: Schluter KERDI, Mapei AquaDefense, Laticrete Hydro Ban, RedGard, USG Durock Tile Membrane
ANSI A118.12 โ Electrically Conductive Mortars (required for heated shower floors)
TCNA Handbook Method B-422 โ Reference for bonded membrane over cement board with tile
FBC R307.2 / IPC 417.5:
โข All shower receptors and compartments shall be waterproof
โข Shower liner (PVC/CPE) shall extend at least 3 inches above the top of the rough curb
โข Liner shall be turned up and secured at studs before cement board / backer installation
โข Liner test: fill with water to 2" below top of rough curb for 24 hours โ zero leakage (FBC R307.2.1)
Inspection Requirements (FBC):
โข Pre-pour inspection required before mortar bed pour (liner, drain, liner dam)
โข Rough plumbing inspection for drain rough-in
โข Some FL counties require flood test inspection by inspector โ not just contractor self-certification
Applies to: Miami-Dade and Broward Counties (and portions of Palm Beach)
โข FL Product Approval required for all waterproofing membranes in HVHZ exterior applications
โข Interior shower waterproofing: standard ANSI 118.10 products acceptable in HVHZ
โข Exterior shower / pool bath walls: must comply with FBC R7017 โ weather-resistant barrier (WRB) required behind tile on exterior walls
โข HVHZ: all cement board fasteners must be corrosion-resistant (304 SS minimum for shower interiors)
โข Miami-Dade Product Control: search productcontrol.miamidade.gov for approved membranes
Steam Shower (HVHZ):
โข HVHZ steam showers require vapor barrier on all walls AND ceiling (not just floor)
โข Ceiling slope โฅ 1/2" per foot toward wall (prevent steam condensate drip)
โข Generator must be FL Product-Approved; outdoor units need 140 mph wind rating
๐ All 67 FL counties | Licensed FL Plumbing Contractor | FL Lic. #CFC1234567