๐Ÿ›๏ธCounty Fee Rates at a Glance
$55โ€“$130
Base permit fee range
0.75โ€“1.5%
Valuation surcharge
2โ€“6 wks
Typical permit window
12 FL
Counties in database
๐ŸงฎPermit Fee Calculator
๐Ÿ“ŠCounty Fee Quick Reference
CountyBase Fee% ValuationPlan Review
Miami-Dade$1301.5%$150+
Broward$851.2%$100+
Palm Beach$751.0%$90+
Hillsborough$650.9%$85+
Pinellas$600.8%$75+
Orange$701.0%$90+
Duval$550.85%$70+
Lee$650.95%$80+
Collier$801.1%$100+
Sarasota$600.8%$75+
Volusia$500.75%$65+
Brevard$550.80%$70+
Note: All fees are estimates based on 2025 county schedules. Fees change annually. Always verify with your county's building department before pulling permits. Impact fees, technology surcharges, and state surcharges (typically $4โ€“8) may apply on top of these rates.
โš ๏ธWhen Is a Plumbing Permit Required in FL?
โœ… New water heater installation
โœ… Whole-house or partial repipe
โœ… Sewer lateral replacement
โœ… Gas line installation, repair, or extension
โœ… New bathroom / plumbing fixture addition
โœ… Backflow preventer installation (commercial & multi-family)
โœ… Water service replacement (meter to house)
โœ… Pool heater installation
โœ… Sprinkler system installation
๐Ÿ”ง Faucet / valve replacement (same location)
๐Ÿ”ง Toilet replacement (like-for-like)
๐Ÿ”ง Showerhead replacement
๐Ÿ”ง Garbage disposal replacement
๐Ÿ”ง Minor drain clearing (rooter service)
๐Ÿ”ง Water heater element replacement (electric)
โš ๏ธ FL unpermitted work: Unpermitted plumbing work is a serious issue in Florida. Insurance claims can be denied if unpermitted work is involved. Home sales can fall through during inspection. Citizens Insurance now requires permit history for water heater installations. Always use a licensed CFC contractor who pulls the permit.
๐Ÿ“…Permit Timeline by Project Type
โฑ๏ธCommon Permit Delays in Florida
โŒ Incomplete applications: Missing scope of work, square footage, fixture count, or valuation
โŒ Missing contractor license #: FL requires CFC license number and qualifier signature on all plumbing permits
โŒ HOA approval pending: Many FL county portals flag HOA properties โ€” approval letter required before permit can issue
โŒ Backlog at building dept: Miami-Dade, Broward, and Hillsborough frequently run 2โ€“3x normal queue times after hurricanes
โŒ Failed first inspection: Re-inspection adds 5โ€“10 business days to final close-out
โŒ Open permit from prior owner: Older unpermitted or unfinished work must be finalized before new permits issue
Pro tip: Most FL counties now offer online permit portals. Miami-Dade uses iBuild, Broward uses MyPermitNow, Palm Beach uses MyGovHub. Licensed contractors can expedite review in most counties by applying with a complete, digital package. Ask your plumber if they use a permit expediting service.
๐ŸšจPost-Hurricane Permit Surge โ€” FL Reality
After major storms (Ian, Irma, Milton), FL county building departments are overwhelmed. Standard timelines can stretch 2โ€“4x during these periods. Typical surge impacts:
CountyNormalPost-Storm
Miami-Dade7โ€“10 days3โ€“6 weeks
Lee County5โ€“7 days8โ€“16 weeks (post-Ian)
Charlotte5โ€“7 days10โ€“20 weeks (post-Ian)
Broward5โ€“8 days2โ€“5 weeks
Hillsborough5โ€“7 days2โ€“4 weeks
๐Ÿ”Inspection Guide by Phase
1. Rough-In Inspection
What inspector checks:
โœ… Pipe sizing per FPC ยง604 (supply) & ยง704 (DWV)
โœ… All connections accessible โ€” walls open, no drywall
โœ… Water supply pipe material (copper, PEX, CPVC)
โœ… DWV slope: 1/4" per foot for horizontal drains
โœ… Cleanout access per FPC ยง708
โœ… Venting โ€” minimum 2" vent stack, proper tie-ins
โœ… Pipe supports per FPC ยง305 (every 6 ft horizontal)
โœ… Anti-scald protection devices in showers (ASSE 1016)
Common failures: Missing cleanout access, DWV slope under 1/4", vent stack too small, PEX without approved manifold system in strict FL counties.
2. Pressure Test Inspection
What inspector checks:
โœ… Water supply pressure test: 100 PSI for 15 minutes
โœ… No pressure drop during hold period
โœ… All caps, plugs, and temporary connections visible
โœ… Gas line test: 15 PSI air test for 15 minutes (where applicable)
โœ… Inspector may require fill with water, not air, for supply test
Common failures: Pinhole leak from fitting not fully seated, compression fitting failure, slab penetrations leaking from thermal expansion during test.
3. DWV (Drain-Waste-Vent) Inspection
What inspector checks:
โœ… All drain lines properly sloped (1/4" per foot minimum)
โœ… Trap size matches fixture unit count
โœ… P-traps โ€” no S-traps allowed in FL
โœ… Vent pipes rise to roof โ€” minimum 6" above roof deck
โœ… Wet venting compliance (FPC ยง910)
โœ… No hub connections or bare ABS (ABS not allowed in FL)
โœ… PVC Schedule 40 or DWV grade throughout
Common failures: S-traps (not allowed under FPC), insufficient venting (especially in slab-on-grade FL homes), drain lines under slab without prior documentation.
4. Final / Certificate of Completion Inspection
What inspector checks:
โœ… All fixtures installed and operational
โœ… Water heater connections complete โ€” supply, discharge, pan, TPR
โœ… All walls closed and finished
โœ… Meter set by utility โ€” water service active
โœ… Pressure reducing valve (PRV) installed if needed (street >80 PSI)
โœ… All permits and inspections complete and signed off
โœ… Plumber's final signature on permit card or digital sign-off
โœ… After final: Certificate of Completion (CC) issued. Job is done. Keep your CC on file โ€” needed for home sales, insurance renewals, and future permit applications.
๐Ÿ“‹Inspection Requirements by Project Type
ProjectRough-InPressureDWVFinal
Water heaterโ€”โ€”โ€”โœ…
Whole-house repipeโœ…โœ…โ€”โœ…
Sewer lateralโœ…โ€”โœ…โœ…
Gas lineโœ…โœ… (air)โ€”โœ…
Bathroom addโœ…โœ…โœ…โœ…
Backflowโ€”โ€”โ€”โœ…
Scheduling tip: In FL, rough-in inspections must be called in by 4 PM the day before for a next-day slot. Most counties offer a 3-hour inspection window (AM or PM). Miami-Dade and Broward allow inspections via online portal. Never close walls before rough-in inspection is passed and documented.
๐Ÿ“ฑHow to Schedule Inspections in FL
CountyScheduling MethodCutoff
Miami-DadeiBuild online portal or (305) 375-29014 PM prior day
BrowardMyPermitNow portal or (954) 765-44004 PM prior day
Palm BeachMyGovHub or (561) 233-51003 PM prior day
HillsboroughPermitUs portal or (813) 272-56004 PM prior day
PinellasOnline portal or (727) 464-38884 PM prior day
OrangeOrangeCountyFL.net or (407) 836-55503 PM prior day
LeeLeeGov.com portal or (239) 533-85854 PM prior day
๐Ÿ“žGet Permit Help from a Licensed FL Plumber
Our licensed CFC plumbers pull permits in all major FL counties โ€” we handle the application, fees, scheduling, and inspections so you don't have to deal with the building department.
โœ…What We Handle For You
โœ… Application preparation and submittal
โœ… Permit fee payment coordination
โœ… Plan review response (if required)
โœ… Inspection scheduling โ€” rough-in, pressure, final
โœ… On-site for all inspections (inspector talks to us, not you)
โœ… Re-inspection if needed at no extra charge
โœ… Certificate of Completion delivered digitally
โœ… Retroactive permit assistance for unpermitted work
๐Ÿ’กFL Permit Cost FAQ
Who pays the permit fee?Usually included in contractor quote
Who owns the permit?The licensed contractor (CFC #)
Can homeowner pull permit?Yes โ€” with Owner-Builder Exemption
Is permit fee tax deductible?Sometimes โ€” consult CPA
How long is permit valid?180 days from issue (FL standard)
Can permit be extended?Yes โ€” $25โ€“75 extension fee
Owner-Builder warning: FL allows homeowners to act as their own contractor (Owner-Builder Exemption), but this transfers full liability to the homeowner. Insurance companies may deny claims if Owner-Builder work was done incorrectly. Always recommend using a licensed CFC contractor for safety and insurance protection.